Contractor Selection Plan (Project Implementation Phase) Package 5: Consulting On Survey To Serve The Design Preparation After The Basic Design Step, Preparing Technical Design - Cost Estimate, Designing Construction Drawings, Preparing Bim Design, Preparing Bidding Documents; Package 6: Consulting On Reviewing Technical Design - Cost Estimate, Designing Construction Drawings; Package 7: Surveying And Drawing Plots; Package 8: Bomb And Mine Clearance. Project "Construction Of New 220/110Kv Hoa Lac Transformer Station And 110/22Kv Connection".