For The Provision Of Design, Remediation And Construction Works For Barrow Waterfront, Barrow

Contract Award

General Information

United Kingdom
   2024/S 000-021809
   Jul 22, 2024
Westmorland and Furness Council
   English
   Other
16000000 GBP
   published: Jul 22, 2024

Contact information

   Ms Gwyneth Timson
Westmorland and Furness Council
South Lakeland House, Lowther Street Kendal LA9 4DQ https://www.westmorlandandfurness.gov.uk/
United Kingdom
   +44 1768212268
   Click here

Goods, Works and Services

Construction work

Contract award information

   key:cn:namibia
   Redstart Northwest Limited
   Redstart Northwest Limited Cheadle Hulme United Kingdom Yes

Bidding documents and attachments

 
  • (Jul 22, 2024)
     Download documents

Summary

      

notice_summary_english: This Tender concerns Phase Two of Marina Village. The Council wishes to appoint a design and build contractor to remediate the site to broadly the same standard as Phase 1 and to install some associated enabling infrastructure on the site to assist future housing suppliers to develop the site for 808 homes (Phase 1 and Phase 2 together). Please refer to the Scope for further information.Contractual Context(a) This ITT is for a two staged procurement to identify a Contractor to undertake the Works identified in the Schedule 2 (Scope relating to the design and remediation/construction of the Barrow Waterfront Phase Two site in Barrow, Cumbria).(b) The 2 stages are:• Stage 1: Design Services (including, but not limited to surveys, investigations, reporting, planning, communications and costings) within an NEC4 Option A Engineering and Construction Contract (ECC).• Stage 2: Construction Works (delivery of the remediation strategy and infrastructure designs as agreed at the end of Stage 1) within an NEC4 Option A Engineering and Construction Contract (ECC).(c) For Stage 1, the Contractor will enter into a NEC4 Option A Engineering and Construction Contract (ECC) with the Council (Client) and undertake the services outlined in the Scope.(d) The Contractor will, as part of the Scope of Stage 1, undertake any necessary supplementary investigations, studies, assessments, etc., produce all drawings and specification for the works; and secure all necessary consents and approvals. The Contractor will, among other things, provide a pre-construction information (PCI) document as well as an updated priced activity schedule for discussion and acceptance at the end of Stage 1. For further Details please refer to the Scope.(e) If the Client accepts the Stage 1 design and price, the Contractor will be asked to provide the Stage 2 works by entering into a Stage 2 Engineering and Construction Contract with the Client.(f) For the avoidance of doubt, the initial co

Original Text


More information: Click here
Please note that this notice is for your information only.
We try our best to have the most accurate and up-to-date information available on our web site, but we cannot guarantee that all of the information provided is error-free.
If you have any updates, corrections, or complaints related to this notice, please contact the responsible purchaser directly.