Search

Consulting Services for Assistance to Project Implementation Of the Helwan Wastewater Treatment Project (EXPIRED)

Request For Expressions of Interest

General Information

Egypt
   Cairo, Egypt
   Jun 22, 2022
Jul 7, 2022
  
EGYPT - Construction Authority for Potable Water and Wastewater (CAPW)
   cf. REOI documents. Criteria include but are not limited to:
Determination of the similarity of the experiences will be based on:
- The contracts size;
- The nature of the Services:
o detailed design for networks and pumping stations, with similar area including preparation of tender documents under FIDIC Guidelines or similar.
o Conceptual design for wastewater treatment plants with capacity not less than 200,000 m3/d including anerobic digesters and tertiary treatment, preparation of tender documents under FIDIC guidelines or similar.
o Construction supervision / Management of works as well as supervision of Operation & Maintenance during Defect Liability Period DLP.
o Preparation of ESIA/ESMP Studies including ATEX study, and
o Communication and visibility and project management and reporting.
- The technical area and expertise: wastewater collection and treatment, sewage sludge treatement (digestion) and production of biogas, world bank and EU standards for environmental and social studies and management plans, project management, communication and visibility.
- The location in the region and ability for at least part of the staff to exchange in Arabic.
The Client will also take into account for the evaluation of the applications the following items:
- Skills and availability of in-house technical back-up/ backstopping provided to the on-site experts;
-Local representatives and partners;
   English
   International procurement
   published: Jun 22, 2022

Contact information

   Hassan Al Far
Chairman
44 Ramses
Cairo
Egypt
   +20 110 096 8906
   Click here

Assignments

Project management consultancy services Consulting services for water-supply and waste consultancy Sewage treatment consultancy services

Bidding documents and attachments

 
  • Amendment: Reply to request for clarifications (506 KB; Jun 28, 2022)
  • Solicitation: REOI consulting services Helwan WW treatment Project (567 KB; May 24, 2022)
     Download documents

Original Text

Please note that this notice is for your information only.
We try our best to have the most accurate and up-to-date information available on our web site, but we cannot guarantee that all of the information provided is error-free.
If you have any updates, corrections, or complaints related to this notice, please contact the responsible purchaser directly.